Product Introduction
The QE Type Double Trolley Bridge Crane is a lifting equipment with two independently operated trolleys mounted on the bridge. The two trolleys can work together on the same crane runways or operate independently.
Product Parameter

|
Parameter |
Unit |
10+10t |
20+20t |
32+32t |
50+50t |
|
Capacity(Main/Aux) |
t |
10+10 |
20+20 |
32+32 |
50+50 |
|
Span Range |
m |
10.5~31.5 |
10.5~31.5 |
10.5~31.5 |
10.5~31.5 |
|
Lifting Height (Main/ Aux ) |
m |
6-30 |
6-30 |
6-30 |
6-30 |
|
Duty Class (Main/Aux) |
- |
A6/A5 |
A6/A5 |
A6/A5 |
A6/A5 |
|
Main Hoist Speed (N-Load/Full) |
m/min |
13.2/6.6 |
10.5/5.3 |
8.9/4.5 |
7.5/3.8 |
|
Aux Hoist Speed (N-Load/Full) |
m/min |
13.2/6.6 |
10.5/5.3 |
8.9/4.5 |
7.5/3.8 |
|
Trolley Travel Speed |
m/min |
40 |
35 |
32 |
28 |
|
Crane Travel Speed |
m/min |
100 |
85 |
75 |
65 |
|
Max Wheel Load (Full) |
kN |
≤180 |
≤260 |
≤350 |
≤480 |
|
Rail Specification |
- |
QU70 |
QU80 |
QU100 |
QU120 |
|
Power Supply |
- |
3-phase 380V 50Hz |
|||
Product Feature And Application
Features of the QE Type Double Trolley Bridge Crane
High Efficiency: Two trolleys can perform lifting operations simultaneously or independently, and work together to handle extra-long or heavy loads, significantly improving efficiency.
Flexibility: Multiple operation modes are available, including independent operation, master-slave following, or synchronized combined lifting, adapting to complex processes.
Large Span: The bridge has a large span, which, combined with the transverse movement range of the two trolleys, effectively covers most of the plant's working area.
Precise Control: Frequency conversion control and synchronization control technologies are used to achieve smooth load lifting and lowering, precise positioning, and trolley synchronization.
Safety and Reliability: Equipped with comprehensive safety protection and interlocking devices.
Applications of the QE Type Double Trolley Bridge Crane
Mainly used in heavy industrial fields requiring frequent lifting, long material flow, or handling large objects:
Iron and Steel Metallurgy: Management of slab and steel coil yards, transfer, and feeding to rolling mills.
Heavy Equipment Manufacturing: Assembly, turning over, and shifting of large components (e.g., wind turbine blades, pressure vessels).
Power Generation Equipment: Installation and maintenance of large parts such as turbine runners and generator stators.
Large-scale Warehousing and Logistics: Storage and loading/unloading of long materials (e.g., pipes, profiles).
Rail Transit: Assembly and maintenance of locomotives and carriages.
Product Details

|
|
Main Girder |
|
|
End Girder |
|
|
Cab (Operator's Cab) |
|
|
Trolley |
|
|
Wheels |
|
|
Hook |
Certification

Packaging&Shipping

FAQ
Q: What are the main advantages of a double-trolley overhead crane compared to a single-trolley model?
A: The main advantages are efficiency and flexibility. Two trolleys can perform independent operations simultaneously or work together to lift extra-long, heavy, or large-sized loads that a single trolley cannot handle, significantly reducing the number of lifts and operation time.
Q: What are the special requirements for its main girder design?
A: The strength, rigidity, and stability of the main girder must be designed to withstand the combined loads and moments generated when both trolleys lift their combined rated load from the most unfavorable positions, ensuring structural safety.
Q: How are the two trolleys controlled?
A: Control is via the cab or a remote control. The control system enables precise independent operation of each trolley, as well as synchronized and coordinated operation modes (e.g., synchronized lifting, synchronized traversing) for both trolleys.
Q: What special safety precautions should be taken?
A: In addition to standard safety devices, the key focus is on safety control during combined lifting operations. A reliable synchronization control system and overload limiters are essential. Strict procedures for combined lifting must be followed to ensure even load distribution and coordinated operation.
Q: What is special about maintenance for this type of crane?
A: Beyond routine maintenance items, special attention must be paid to the synchronization of the two trolleys, the parallelism and wear of the rails (especially the main girder rails), and the reliability of the anti-collision system between the two trolleys.
Q: What key parameters need to be considered during selection?
A: In addition to standard parameters like lifting capacity, span, lifting height, and duty classification, the following must be specified: the individual lifting capacity of each trolley, the combined lifting capacity of both trolleys, the effective working area under the main girder, and functional requirements such as the need for synchronized control.
Related Products






















